A WATER POLLUTION CONTROL FACILITY IS UNDER CONSTRUCTION AT COLSTRIP. THE FOUR POWER PLANTS (ONE ALREADY UNDER CONSTRUCTION) PLANNED FOR THE AREA, WILL DRASTICALLY AFFECT WATER QUALITY

Chicago citation style
Environmental Protection Agency. 12/2/1970-. A WATER POLLUTION CONTROL FACILITY IS UNDER CONSTRUCTION AT COLSTRIP. THE FOUR POWER PLANTS (ONE ALREADY UNDER CONSTRUCTION) PLANNED FOR THE AREA, WILL DRASTICALLY AFFECT WATER QUALITY. 1973-06. Retrieved from the Digital Public Library of America, http://catalog.archives.gov/id/549162. (Accessed June 23, 2018.)
APA citation style
Environmental Protection Agency. 12/2/1970-, (1973-06) A WATER POLLUTION CONTROL FACILITY IS UNDER CONSTRUCTION AT COLSTRIP. THE FOUR POWER PLANTS (ONE ALREADY UNDER CONSTRUCTION) PLANNED FOR THE AREA, WILL DRASTICALLY AFFECT WATER QUALITY. Retrieved from the Digital Public Library of America, http://catalog.archives.gov/id/549162
MLA citation style
Environmental Protection Agency. 12/2/1970-. Retrieved from the Digital Public Library of America <http://catalog.archives.gov/id/549162>.
Note: These citations are programmatically generated and may be incomplete.