• Creator
  • Fitz, Morgan
  • Created Date
  • 1941
  • Description
  • Label on verso: WORK PROJECTS ADMINISTRATION, M-9; STATE OF WASHINGTON; Date: 3/4/41; OP No. 65-2-93-146; Zone 1; Photo by Morgan Fitz, Camp Kettle; Title: Columbia Basin Clearing Project; Caption: Hawk Creek Bend. One of the widest points of the lake to be formed by rising backwater behind Grand Coulee Dam will be near the mouth of Hawk Creek, which is 38 miles above Grand Coulee Dam and is at the left in the far background. The flat of land ... more
    Label on verso: WORK PROJECTS ADMINISTRATION, M-9; STATE OF WASHINGTON; Date: 3/4/41; OP No. 65-2-93-146; Zone 1; Photo by Morgan Fitz, Camp Kettle; Title: Columbia Basin Clearing Project; Caption: Hawk Creek Bend. One of the widest points of the lake to be formed by rising backwater behind Grand Coulee Dam will be near the mouth of Hawk Creek, which is 38 miles above Grand Coulee Dam and is at the left in the far background. The flat of land which the Columbia river now sweeps around to form a large bend in the river will soon be completely covered with water.US WPA 717[Grand Coulee Dam 365]. less
  • Format
  • Photograph
    image
    silver gelatin, b&w
    Scanned from a photographic print at 100 dpi in JPEG format and resized to 768x512 ppi or scanned from original text at 400 dpi in JPEG format and resized to 600 ppi horizontal. Saved at compression rate 3. 2000