• Created Date
  • 1919
  • Description
  • Photographs of the Skagit River Hydroelectric Project constructed between 1918-1961. The Gorge Dam and Powerhouse were built by Seattle City Light and completed in September of 1924.Caption on image: Gorge Dam Site. 5064. 10-17-19 Caption below image: Crib dam located here. Early drilling operations.PH Coll 45.1-23.
  • Format
  • Photograph
    image
    silver gelatin, b&w
    Scanned from a photographic print using a Microtek Scanmaker 9600XL at 150 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005