US Army soldiers from the 74th Assault Floating Bridge Company, Fort Hood, Texas, and the 502nd Assault Floating Bridge Company, Hanau, Germany, are designing and constructing a 313.5-meter long, 13.5-meter wide bridge, over the Sava River, near the Bosnia-Herzegovina town of Orasje and the Croatian city of Zupanja. An interior bay section of the Ribbon Bridge is being position for attachment to the assembled bridge. Operation JOINT ENDEAVOR, 12 October 1996. (Duplicate image, see also DD-SD-00-00428 or search 961012-A-4491R-015))