• Creator
  • Pickett, Lee
  • Created Date
  • 1926
  • Description
  • Construction of the Cascade Tunnel for the Great Northern Railway.Caption on image: G.N. Ry. New 8 Mile Tunnel (Bosses), Pioneer Tunnel Worlds Record Crew. 1157 ft. 8x9 tunnel in 29 1/2 days, Oct. 1926. L to R: Supt. H.J. King; Andy Olson, Shifter; Frank Robertson, Shifter; S.M. Smyth, Walking Boss; Jack D. Harrington, Walking Boss; H.D. Keerl, Walking Boss; Claude Dahlquist, Shifter; John Watters, Engineer. Pickett Photo Co., Index, Wn. c1926... more
    Construction of the Cascade Tunnel for the Great Northern Railway.Caption on image: G.N. Ry. New 8 Mile Tunnel (Bosses), Pioneer Tunnel Worlds Record Crew. 1157 ft. 8x9 tunnel in 29 1/2 days, Oct. 1926. L to R: Supt. H.J. King; Andy Olson, Shifter; Frank Robertson, Shifter; S.M. Smyth, Walking Boss; Jack D. Harrington, Walking Boss; H.D. Keerl, Walking Boss; Claude Dahlquist, Shifter; John Watters, Engineer. Pickett Photo Co., Index, Wn. c1926. 3302. less
  • Format
  • image
    Negative
    6 1/2 x 8 1/2 in.
    glass, b/w
    Scanned from a 8 x 10 in. glass negative using a Microtek Scanmaker 9600XL at 200 dpi in JPEG format at compression rate 3 and resized to 768 width ppi. 2001