Electrolysis, Cambridge Water Works, 6-inch pipe from Boylston Street near Eliot Street, showing electrolytic pittings after storing 13 months in Water Works shop (compare with No. 5809), Cambridge, Mass., Jan. 10, 1906

Chicago citation style
Massachusetts, Metropolitan Water and Sewerage Board. Electrolysis, Cambridge Water Works, 6-inch pipe from Boylston Street near Eliot Street, showing electrolytic pittings after storing 13 months in Water Works shop (compare with No. 5809), Cambridge, Mass., Jan. 10, 1906. 1906-01-10. Retrieved from the Digital Public Library of America, http://ark.digitalcommonwealth.org/ark:/50959/2v23wj783. (Accessed June 25, 2018.)
APA citation style
Massachusetts, Metropolitan Water and Sewerage Board, (1906-01-10) Electrolysis, Cambridge Water Works, 6-inch pipe from Boylston Street near Eliot Street, showing electrolytic pittings after storing 13 months in Water Works shop (compare with No. 5809), Cambridge, Mass., Jan. 10, 1906. Retrieved from the Digital Public Library of America, http://ark.digitalcommonwealth.org/ark:/50959/2v23wj783
MLA citation style
Massachusetts, Metropolitan Water and Sewerage Board. Retrieved from the Digital Public Library of America <http://ark.digitalcommonwealth.org/ark:/50959/2v23wj783>.
Note: These citations are programmatically generated and may be incomplete.