• Description
  • The original finding aid described this as: Description: View of Pressurized Mating Adapter 3 (PMA-3) being relocated by the Space Station Remote Manipulator System (SSRMS) / Canadarm2 from the Node 2 / Harmony zenith hatch to the Node 3 / Tranquility port hatch. Photo was taken during Expedition 22 / STS-130 joint operations. Subject Terms: STS-130, Expedition 22, Spacecraft Docking Modules, Relocation, Space Station Mobile Servicing System D... more
    The original finding aid described this as: Description: View of Pressurized Mating Adapter 3 (PMA-3) being relocated by the Space Station Remote Manipulator System (SSRMS) / Canadarm2 from the Node 2 / Harmony zenith hatch to the Node 3 / Tranquility port hatch. Photo was taken during Expedition 22 / STS-130 joint operations. Subject Terms: STS-130, Expedition 22, Spacecraft Docking Modules, Relocation, Space Station Mobile Servicing System Date Taken: 2/16/2010 Categories: Station Configuration Interior_Exterior: Exterior Ground_Orbit: On-orbit Element: Pressurized Mating Adapter 3 (PMA3) Original: Digital Still Preservation File Format: TIFF. less
  • Rights
  • Unrestricted