Electrolysis, Boston Water Works, Massachusetts Avenue at Harrison Avenue, gap in 30-inch pipe line where pipe injured by electrolysis was removed to make new connection, looking west (compare with Nos. 5968 and 5969), Boston, Mass., Oct. 26, 1905

Chicago citation style
Massachusetts, Metropolitan Water and Sewerage Board. Electrolysis, Boston Water Works, Massachusetts Avenue at Harrison Avenue, gap in 30-inch pipe line where pipe injured by electrolysis was removed to make new connection, looking west (compare with Nos. 5968 and 5969), Boston, Mass., Oct. 26, 1905. 1905-10-26. Retrieved from the Digital Public Library of America, http://ark.digitalcommonwealth.org/ark:/50959/2v23wj14j. (Accessed June 19, 2018.)
APA citation style
Massachusetts, Metropolitan Water and Sewerage Board, (1905-10-26) Electrolysis, Boston Water Works, Massachusetts Avenue at Harrison Avenue, gap in 30-inch pipe line where pipe injured by electrolysis was removed to make new connection, looking west (compare with Nos. 5968 and 5969), Boston, Mass., Oct. 26, 1905. Retrieved from the Digital Public Library of America, http://ark.digitalcommonwealth.org/ark:/50959/2v23wj14j
MLA citation style
Massachusetts, Metropolitan Water and Sewerage Board. Retrieved from the Digital Public Library of America <http://ark.digitalcommonwealth.org/ark:/50959/2v23wj14j>.
Note: These citations are programmatically generated and may be incomplete.