• Created Date
  • 1923
  • Description
  • Photographs of the Skagit River Hydroelectric Project constructed between 1918-1961. The Gorge Dam and Powerhouse were built by Seattle City Light and completed in September of 1924.Caption on image: Reinforcing Steel for Draft Tube #1, 2-23-23. E277 PH Coll 45.1-46b.
  • Format
  • Photograph
    image
    silver gelatin, b&w
    Scanned from a photographic print using a Microtek Scanmaker 9600XL at 150 dpi in JPEG format at compression rate 3 and resized to 768x600 ppi. 2005